Mechanical Installations

What We Offer

  • Plant Movement
  • CAD Design Drawings
  • Fuel Tank Fabrication & Installation
  • Fuel Pipe Work Fabrication
  • Steel Frame Manufacturing
  • Air Intake & Discharge Exhaust Silencers
  • Flues
  • Ventilation & Ductwork
  • Attenuation & Acoustics
  • Air Start Systems
  • Radiator Systems
  • Mechanical Testing
  • Maintenance Response
  • Pipe Stress Analysis: Bentley Autopipe or Ceasar II

Mechanical Projects

ASEE have, over the past 25 years developed and built up our own mechanical installations team to synchronise precisely into electrical installation engineering projects. ASEE has established a track record in the capability to simultaneously combine the building of both mechanical and electrical systems elements, allows for complete control and smooth integration of the process from design through to construction, installation, completion and commissioning.

See All Mechanical Projects

Skondal Data Centre

Installation of a fully welded fuel transfer system with over spill line and 2 x 13,000L double skinned above ground bulk storage tanks with leak detection provided. ASEE also provided and installed a dual pump system housed in a stand alone kiosk, suitable for external temperatures of -20 degC. All interconnecting control cabling between the… View Article

Hertfordshire Data Centre

2 x 130,000L double skinned below ground bulk storage tanks, manufactured to EN12285-1, with leak detection provided. 2 x pump skids comprising of a duty/standby system. 2 x fill points complete high level alarm units and fuel capacity gauges. Installed a below ground plastic pipe in pipe fuel system with leak detection monitoring.

Hampshire Data centre

Removal of existing services and replacement chiller installation. We also carried out the installation of new high level cable containment system and replaced chiller supply cables.

Our Client Base includes

NHS
Microsoft
BBC
ISG
Laing O'Rourke
TfL
Primark
IBM