Northern Data Centre

Project Scope

Our team expertly handled the offloading and precise positioning of four containerised generator sets, each boasting a significant 2.3 MVA capacity. To guarantee seamless integration and optimal performance, we meticulously completed a full internal mechanical and electrical fit-out, ensuring these generators can seamlessly pick up the critical load during any power outage. Furthermore, for long-term reliability, we installed a robust system of 10 high-voltage generators (also rated at 2.3 MVA) accompanied by the necessary high-voltage switchgear for efficient power distribution. ASEE prioritised patient safety by installing secure, EN 12285-compliant underground fuel storage tanks with a massive 380,000L capacity. This comprehensive backup power solution from ASEE guarantees peace of mind for hospital staff and uninterrupted power for critical medical equipment, ensuring patient care continues smoothly during any power disruptions.

Project Overview

Installation of 10 x 2.3 MVA HV generators and associated HV switchgear and 380,000 L bulk fuel storage tanks manufactured to EN 12285. (All storage tanks underground).

Location

United Kingdom

Sector

Data Centre

Gallery
bottom of page