New Change Central London
- Location: St Pauls, Central London, UK
-
Project Scope:
Installation of 2 x 2.0 MVA and 2 x 750 kVA Generators on the roof of the building, installation of 4 bulk tanks in basement & associated fuel transfer pipe work.
Installation of all associated generator control cables.