We installed a mix of robust generators (2 x 2.0 MVA & 2 x 750 kVA) on the roof, with secure fuel storage (4 tanks) in the basement & meticulously planned transfer pipes. Control cables ensure seamless operation.
Project Overview
Installation of 2 x 2.0 MVA and 2 x 750 kVA Generators on the roof of the building, installation of 4 bulk tanks in basement & associated fuel transfer pipe work.
Installation of all associated generator control cables.