Hertfordshire Data Centre

Project Scope

We installed massive, double-skinned underground fuel tanks (2 x 130,000L, EN12285-1 compliant) with advanced leak detection. Our reliable pump skids (duty/standby) and fill points (alarms & gauges) ensure seamless refuelling and backup power.

Project Overview

2 x 130,000L double skinned below ground bulk storage tanks, manufactured to EN12285-1, with leak detection provided.

2 x pump skids comprising of a duty/standby system.

2 x fill points complete high level alarm units and fuel capacity gauges.

Installed a below ground plastic pipe in pipe fuel system with leak detection monitoring.

Location

United Kingdom

Sector

Data Centre