Hertfordshire Data Centre
- Location: WelwynGarden City
-
Project Scope:
2 x 130,000L double skinned below ground bulk storage tanks, manufactured to EN12285-1, with leak detection provided.
2 x pump skids comprising of a duty/standby system.
2 x fill points complete high level alarm units and fuel capacity gauges.
Installed a below ground plastic pipe in pipe fuel system with leak detection monitoring.