top of page

OUR PROJECTS

BBC Portland Place

Project Scope

We installed a comprehensive backup power system in the basement, featuring 3 powerful 3.75 MVA generators. To ensure seamless operation, we constructed a secure, double-skinned 103,000L fuel tank on-site. For efficient heat management, we installed roof-mounted cooling radiators and a comprehensive cooling pipe network – over 500 meters long – spanning 12 levels between the roof and basement. This robust solution guarantees reliable power and optimal operating temperatures, keeping the BBC broadcasting smoothly and the airwaves alive.

Project Overview

Installation of 3 x 3.75 MVA generators in basement over 2 phases. Site construct 103,000 L double skin fuel tank in basement. Installation of roof mounted cooling radiators. Installation of c500m cooling pipe work over 12 levels between the roof & basement.

Location

United Kingdom

Sector

Commercial

Gallery
bottom of page