top of page
BBC Phase 1.jpg

GENERATOR INTEGRATION

WHAT WE OFFER!

ASEE Group offer a full bespoke generator installation package. Designed to specifically meet the client's requirements, we have built up a strong team of experts who can deliver the very best in quality turn-key generator installs every time.

Generator Integration Include:

Offload and position

Electrical and Control Systems

Ventilation and Cooling Systems

Acoustic Systems

Exhaust Gas Systems

SCR Systems

Fuel Systems

Bulk Fuel Tanks

Day Fuel Tanks / Dump Fuel Tanks

Fuel Pipe Fabrication

Fuel Polishing

Fuel Flushing

Commissioning

Containerised sets

FAT Testing

Local Code Compliance

ATEX Installations

Generator Room Turn Keys Solutions

Generator-fan alignment & coupling

GENERATOR INTEGRATION PROJECTS

Confidential Data Centre - Madrid

We undertook the unloading and positioning, installation, steel frame errection, acoustic cladding of multiple generators in a greenfield data centre and administration block.

BBC Portland Place

ASEE Group powered up BBC Broadcasting House! We installed robust backup generators (3 x 3.75 MVA) & a secure fuel tank. Efficient roof radiators & extensive cooling pipes ensure smooth operation.

Berkshire Data Centre

ASEE Group supercharged Berkshire Data Centre! We installed 6 powerful generators with massive, secure fuel tanks (2 x 80,000L & 6 x 4,000L) & a robust, leak-protected fuel transfer system.

Canary Wharf Data Centre

ASEE Group empowered Canary Wharf's data centre! We installed 3 robust, roof-mounted generators with secure fuel lines and control cables for reliable backup power.

Dumfries and Galloway Royal Infirmary

ASEE Group bolstered Dumfries hospital's power! We delivered & installed 4 containerised generators & ensured seamless operation with a full internal fit-out.

Dusseldorf

ASEE Group powered up Düsseldorf! We delivered & installed 2 containerised generators with secure fuel systems & control cables.

HP Data Centre Doxford

ASEE Group powered up HP's Doxford data centre! We delivered & installed 2 secure fuel tanks & containerized generators. A complete external fuel system ensures smooth operation.

Hyde Park Corner

ASEE Group ensured peace & quiet at Hyde Park Corner! We installed powerful backup generators (2 x 1650 kVA) in the basement with muffled piping & soundproof walls.

New Change Central London

ASEE Group powered up New Change, London! We installed robust generators (2x 2.0 MVA, 2x 750 kVA) & secure underground fuel tanks for reliable backup power.

Northern Data Centre

ASEE Group supercharged Northern Data Centre! We installed 10 powerful 2.3 MVA HV generators & massive, secure fuel tanks (380kL, EN 12285) for reliable backup power.

Royal Liverpool University Hospital

ASEE Group powered up Royal Liverpool University Hospital. We delivered 4 containerised generators & ensured seamless operation with a full internal mechanical & electrical fit-out.

Gibraltar Data Centre

ASEE Group secured Gibraltar Data Centre's power! We installed 2 robust generators (500kVA each) with a secure, leak-protected fuel system & auto-filling cabinet.

bottom of page